SM> Wed 10 May 1pm EDT - Semantic Model Teleconference

SM> Wed 10 May 1pm EDT - Semantic Model Teleconference

McDonald, Ira imcdonald at sharplabs.com
Tue May 9 22:24:45 EDT 2006


Hi,
 
Pete and I chatted on the phone and resolved his issue with Subunits
structure (he accidentally imported the wrong element - my bad docs).
 
Please pull down the updated schema I just posted (and unpack them
into the same directory you put Pete's recent SM ZIP file) to view a
sketch of SM/2.0 that integrates everything in WIMS/1.0 with SM/1.0
(except for the legacy Job.xsd in SM/1.0 - see release note).
 
Particularly, you should pull down and look at:
 
  HYPERLINK
"ftp://ftp.pwg.org/pub/pwg/wims/schemas/PwgSm-IM-20060509.pdf"ftp://ftp.pwg.
org/pub/pwg/wims/schemas/PwgSm-IM-20060509.pdf
  - the exploded structured view of 'Server' from XMLSPY
 
Oops, I see there's a typo in my release note for:
 
  HYPERLINK
"ftp://ftp.pwg.org/pub/pwg/wims/schemas/PwgSm-IM-20060509.xsd"ftp://ftp.pwg.
org/pub/pwg/wims/schemas/PwgSm-IM-20060509.xsd
  - note the correct 'PwgSm' (lowercase 'm')
 
Cheers,
- Ira
 

Ira McDonald (Musician / Software Architect)
Blue Roof Music / High North Inc
PO Box 221  Grand Marais, MI  49839
phone: +1-906-494-2434
email: imcdonald at sharplabs.com 

-----Original Message-----
From: owner-sm at pwg.org [mailto:owner-sm at pwg.org]On Behalf Of Zehler, Peter
Sent: Friday, May 05, 2006 11:50 AM
To: sm at pwg.org
Subject: SM> Wed 10 May 1pm EDT - Semantic Model Teleconference



All, 

 
On Wednesday May 10 there will be a Semantic Model Teleconference . This
week we will continue focus on the updated straw man proposal for a PWG
Semantic Model v2.0 Schema. Those of you who will not have access to
MyMeetings access should have the updated schema available. 

If anyone has any items they would like to discuss please forward them to me
and I will modify the agenda to include them.


Date/Time:
May 10 2006
1 pm - 2 pm eastern
Dial-In
Tele-Con Number:1-866-365-4406
PassCode: 2635888
WebEx Meeting Details ( HYPERLINK
"http://www.mymeetings.com"http://www.mymeetings.com):
Meeting Number: 747275324
Meeting Passcode: PwgSm
Meeting Host: Peter Zehler
Join Instructions for Instant Net Conference:
1. Join the meeting now:
HYPERLINK
"http://www.mymeetings.com/xerox/nc/join.php?i=747275324&p=PwgSm&t=c"http://
www.mymeetings.com/xerox/nc/join.php?i=747275324&p=PwgSm&t=c
2. Enter the required fields.
3. Indicate that you have read the Privacy Policy.
4. Click on Proceed. If you have problems with the above link, go to
HYPERLINK "http://www.mymeetings.com"http://www.mymeetings.com , select
"join an event" and use the meeting number and passcode from above. 

Agenda:         1) Walk through the updated straw man schema < HYPERLINK
"ftp://ftp.pwg.org/pub/pwg/Semantic-Model/Schema/PWG-SM-050506.zip"ftp://ftp
.pwg.org/pub/pwg/Semantic-Model/Schema/PWG-SM-050506.zip>

                2) Discuss Ira's new Subunits version that includes Finisher
(See < HYPERLINK
"http://www.pwg.org/hypermail/sm/0335.html"http://www.pwg.org/hypermail/sm/0
335.html>)

                3) Discuss alternatives to SubUnits schema structure 
                3) Discuss next steps and dates 

Pete


I have created an updated version of the SM schema. 
A local version (i.e. relative links to schema files stored in the same
directory) of the schema is available at 
< HYPERLINK
"ftp://ftp.pwg.org/pub/pwg/Semantic-Model/Schema/PWG-SM-050506.zip"ftp://ftp
.pwg.org/pub/pwg/Semantic-Model/Schema/PWG-SM-050506.zip>. I have included
an XMLSPY project file. 

What I have done since the last update is 
1) Added the Ira's updated subunits as a peer of the services (e.g. Printer)

        a) included an alternative structures for subunits for discussion
purposes 
What I have not done is 
1) Renamed the services to be consistent with WIMS 
2) Added WIMS (except for Subunits) 
3) Updated the master list of elements 
4) Done anything to the SM specification 
Pete 
Peter Zehler
XEROX
Xerox Innovation Group
Email: Peter.Zehler at XeroxLabs.com
Voice: (585) 265-8755
FAX: (585) 265-7441
US Mail: Peter Zehler
Xerox Corp.
800 Phillips Rd.
M/S 128-25E
Webster NY, 14580-9701 


--
No virus found in this incoming message.
Checked by AVG Free Edition.
Version: 7.1.392 / Virus Database: 268.5.4/332 - Release Date: 5/4/2006



-- 
No virus found in this outgoing message.
Checked by AVG Free Edition.
Version: 7.1.392 / Virus Database: 268.5.5/334 - Release Date: 5/8/2006
 
-------------- next part --------------
An HTML attachment was scrubbed...
URL: http://www.pwg.org/archives/sm/attachments/20060509/0454e4ab/attachment.html


More information about the Sm mailing list