[SM3] SM Workgroup Conference Call -

[SM3] SM Workgroup Conference Call -

wamwagner at comcast.net wamwagner at comcast.net
Tue Nov 8 16:48:50 UTC 2016


Our next Semantic Model WG call will be Wednesday 9 November 2016 at 10 am-11 am US Pacific / 1pm-2 pm US Eastern

Call-in toll-free number (US/Canada): 1-866-469-3239
Call-in toll number (US/Canada): 1-650-429-3300 (Primary)
Call-in toll number (US/Canada): 1-408-856-9570 (Backup)

Attendee Access Code: *******#
Attendee ID Code: # (empty)

NOTE:  Please DO NOT USE the audio bridge number listed by WebEx - instead use the regular PWG conference bridge listed above!
-------------------------------------------------------
Meeting information
-------------------------------------------------------
Topic: SM  WG
Date: Wednesday, from 5 October 2016 to no end date
Time: 1:00 pm, Eastern Daylight Time (New York, GMT-04:00)
Meeting Number: 682 763 393
Meeting Password: Printing123
-------------------------------------------------------
To join the online meeting (Now from mobile devices!)
1. Go to https://ieee-isto.webex.com/ieee-isto/j.php?MTID=m0359478143ca01e059a570ada91f3573
2. If requested, enter your name and email address.
3. If a password is required, enter the meeting password: Printing123
4. Click "Join".
-------------------------------------------------------
For assistance: 
1. Go to https://ieee-isto.webex.com/ieee-isto/mc
2. On the left navigation bar, click "Support".

Proposed Agenda:

(1) PWG IP Policy, Minute Taker, Roll Call and Agenda Review
(2)  Status on Outstanding Action Items:
   a) First Cut of 3D Print Job Ticket Example- Paul
   b) First Cut of 3D Print  Service Model - Daniel
   c) Paul to contact PWG members to prototype JDFMAP.
   d) Bill to continue working on IANA IPP element list for SM2 
 (3) SM Topics in  Nov. Plenary PWG Design Principles Whitepaper – Values of SM effort
   (a) The SM effort concentrates of the basic features necessary in communicating with imaging services, independent of the protocols used in that communication. The operations and elements remain valid, even though the lower level communication levels may change.
  (b)The model view of  an imaging system allows the inherent parallelism between different services to be developed and exploited.
  (c)The abstract model  provides a more comprehensible view of the generalized Imaging System which, with the tools available, allows zooming between a high level overview and very specific detailed elements at the lowest level. This makes communicating the PWG concept of imaging , at all levels, much easier and allows better a interface with other standards organizations dealing with related matters.
(4) Review of Nov. SM Plenary and Meeting Slides ( Posted at pwg-plenary-november-2016-10-30-r1-SMUpdates.pptx and Semantic-Model-November-2016-meeting rev1.pptx in ftp://ftp.pwg.org/pub/pwg/sm3/slides/
  (a) Should there be a Charter Review? -  [Current charter at ftp://ftp.pwg.org/pub/pwg/sm3/charter/ch-sm30-charter-20151115.pdf does not identify SM2  vs SM3 activities and does not identify Print3D efforts.
 (b) Does the new chair have an alternate view of workgroup mission and organization?
(5) Other issues
    a. Webpage - More Information About the PWG Semantic Model  
         i. Should the Bowseable Schema reference 1.185 or a later version? Should there be some explanation about it being ‘in process”
         ii. Should the Browseable schema link start with the Print Service, or at the top of the model? 
         iii. Should there be a higher level introduction? Does going directly to ‘Table 1 without some explanation communicate to the audience we are doing and why?
         iv. Is the table the best example?
     b. Smith’s request that we structure and schedule our projects
(6) Action Items



_______________________________________________
sm3 mailing list
sm3 at pwg.org
https://www.pwg.org/mailman/listinfo/sm3




More information about the sm3 mailing list